Extension of Cessac hydro power station
In 2014, TEXSYS has provided the total Electricity / Automation / Supervision sub-assembly for the refurbishment of the Cessac hydro power plant on the Lot river. It is equipped with 2 Kaplan turbines and asynchronous generators for a nominal power of 565 kW.
In 2016, the extension of the plant has been undertaken, consisting in a new building equipped with a Kaplan turbine and a low speed 600 kW alternator. For this extension TEXSYS is performing the automatization of the new turbine and its integration in the existing plant in order to ensure an optimal regulation and dispatching of the entry flow.